Procurement and configuration for the three-product proposal

Request a project list for M1, M4 and AG-2701X. Quote equipment separately from CTs, power supplies, protection, installation, wiring and software services.

Prepare these inputs

Three-phase and single-phase circuit counts, CTs, panel locations, bus distances, sampling targets, networking and the target system. Include known variants and point maps.

Delivery sequence

Configuration review → prototype and protocol integration → site-specific acceptance → rollout configuration. Equipment quantities and services are quoted after project review.

Download industry handbook (Simplified Chinese PDF)Request configuration and a quotation

Orders are currently handled by quotation. Official marketplace listings will be linked here when available.

Add AC-2705X for equipment status and control

AC-2705X field I/O converter with DCZD branding

Extend the M1, M4 and AG-2701X collection setup with AC-2705X where needed: four isolated inputs collect status and eight relay outputs connect field controls. Confirm signals, loads and feedback before configuring equipment and software.

View AC-2705X Discuss the control extension

Download complete-solution handbook (Simplified Chinese PDF, V2.1)